| Energy Audits |
Energo helps the customer in gaining deemed generation benefits and achieving compliance to various statutory norms laid by the Govt. of India including pollution Control norms, energy conservation etc. in a credible and cost effective way.
We carry out Energy Audits on: |
> Boilers
> Co-Generation facilities
> Waste Heat Recovery System
> Material and Energy balances of Process Plants
> Pumping Systems
> Compressed Air Systems
> Power Generating Stations
> Milling & Grinding Circuits
> Cooling Towers
> Power Transmission & Distribution Systems
> Commercial Buildings
> Factories & Process Industries |
| Our methodology includes: |
> Identification of all Energy Systems
> Evaluation of the condition of the systems
> Analysis of the impact of improvements to those systems
> Preparation of an Energy Audit Report |
| Preliminary Audit: |
| To prioritise energy efficiency objects and determine the need for a more detailed audit |
| General / Detailed Audit: |
To identify all energy conservation measures appropriate for the facility given its operating parameters. A detailed financial analysis is performed for each measure based on detailed implementation cost estimates, site-specific operating cost savings, and the customer's investment criteria. Sufficient detail is provided to justify project implementation. |
| Investment-Grade Audit: |
To provide a dynamic model, energy use characteristics of both existing facility and all possible energy conservation measures are identified. This gives guaranteed savings from the implementation of energy projects. This grade of audit can also be used for the purpose of Benching by Regulators or an Individual Regulator's Benching Compliance. |
| Energy Audits for Thermal Power Plants: |
> Boiler Performance
> Fans Performance
> Pulveriser Performance
> Air Heater Performance
> Turbine Heat Rate Test
> Condenser Performance
> H.P. / I.P. / L.P. Turbine Enthalpy Drop Test
> Cooling Tower Performance
> H.P. / L.P. Feed Heater Performance |
| Efficiency Improvements of Thermal Power Plants: |
> Optimisation of Pulveriser and Firing System
> Water-Steam-Cycle
> Thermodynamical examination and Heat Rate Optimisation
> Adjustments of Flue Gas Exit Temperatures for Unit Heat Rate Optimisation
> Performance Measurement by Instrument Accuracy
> Condenser Performance Improvement
> Auxiliary Power Optimisation
> Performance Improvement by Correct Application of Thermal Kit / Correction Curves
> R&M based Efficiency Improvements |
| |