ESCO-Energy Experience

R&M Assignment

Sl.No. Assignment Name Status
1 Consultancy services for R&M and LE studies at 3x55 MW units 1,2 &3 in Faridabad thermal power station, HPGCL Completed in Sep 2000
2
Consultancy Services to Design ‘Renovation & Modernization Scheme to improve the Energy Efficiency, Upgrade Capacity and Residual Life of Chandrapur Super Thermal Power Station,Unit-1 & 2(210 MW)’
Ongoing
3
Consultancy Services to Design ‘Renovation & Modernization Scheme to improve the Energy Efficiency, Upgrade Capacity and Residual Life of Panipat Thermal Power Station,Unit-3 & 4(2x110 MW)’
Ongoing
4
Consultancy Services to Design ‘Renovation & Modernization Scheme to improve the Energy Efficiency, Upgrade Capacity and Residual Life Assessment of Bhusawal Thermal Power Station,Unit-2(210 MW)’
Signed the draft contract

List of the Units where Oxide Scale has been completed

Sl.No. Assignment Name Client Name Year of Exeution
1 Internal Oxide Scale Thickness Measurement in Boilers during Unit#1 & Unit#2 overhauls. NTPC, Simhadri September 2008
2 In situ oxide-Scale thickness measurement of Boiler re-heater and platen super heater tubes. Nalco One unit has been completed in December 2008.
3 In-situ oxide layer measurement in Boiler Stage-II units. NTPC, Talcher (Kaniha) July 2008
4 In-situ oxide layer thickness measurement in Boiler Stage-II units for FY – 2010-11. NTPC, Talcher (Angul)  
5 Internal Oxide Layer Thickness Measurements in Boiler during unit # 1 NTPC, Simhadri  

List of the Units where RLA / LE study has been completed

Sl.No. RLA/LE STUDY OF BOILER/TURBINE CLIENT NAME YEAR OF EXECUTION
1 Residual Life Assessment Studies of 32 MW Boiler (Wagner-Biro Austria meke) of Panki Thermal Power Station, Panki, Kanpur. Panki TPS, UPSEB December 1999
2 RLA and LE studies of 2x30 MW units at Amarkantak TPS, MPEB, Chachai. Unit # 1, Amarkantak TPS, MPEB January 2000
3 RLA and LE studies of 2x30 MW units at Amarkantak TPS, MPEB, Chachai. Unit # 2, Amarkantak TPS, MPEB March 2000
4 R&M and LE study of Boiler, Turbine & 75 MVA Transformer of 1x55 MW unit # 3 of Faridabad TPS. Faridabad TPS, HPGCL September 2000
5 R&M and LE study 55 MW unit # 1 and comprehensive R&M& LE study of Balance of Plant of 3x55 MW units at Faridabad TPS. Faridabad TPS, HPGCL September 2000
6 R&M and LE study of 55 MW unit # 2 of Faridabad TPS. Faridabad TPS, HPGCL September 2000
7 Residual Life Assessment Studies of Turbine & Generator of Unit-IV of 110 MW at Panki Thermal Power Station, Panki, Kanpur Panki TPS, UPSEB 2001-2002
8 Carrying out RLA & LE studies of 5x62.5 MW units at Satpura TPS, Sarni. Unit # 5, Satpura TPS, MPEB March 2003
9 Carrying out RLA & LE studies of 5x62.5 MW units at Satpura TPS, Sarni. Unit # 4, Satpura TPS, MPEB March 2003
10 Carrying out RLA & LE studies of 5x62.5 MW units at Satpura TPS, Sarni. Unit # 3, Satpura TPS, MPEB April 2003
11 Carrying out RLA & LE studies of 5x62.5 MW units at Satpura TPS, Sarni. Unit # 2, Satpura TPS, MPEB April 2003
12 Carrying out RLA & LE studies of 5x62.5 MW units at Satpura TPS, Sarni. Unit # 1, Satpura TPS, MPEB May 2003
13 Residual Life Assessment (RLA) study of VU-60 (84 TPS) BHEL, Boiler of CPP, BRPL. BRPL Bongaigaon December 2004
14 RLA study of 120 MW TG set & Auxiliaries of Unit # 5 at Korba East LEP, Korba, Chhattisgarh for BHEL. Korba (East), CSEB December 2004
15 Residual Life Assessment (RLA) study of pressure parts of 120 MW Boiler Unit # 2 of Stage-I at Wanakbori Thermal Power Station for Gujarat Electricity Board (GEB). Wanakbori TPS January 2005
16 Remaining Life Assessment (RLA) inspection of HRSG-2 of GTPP Plant at IPCL-Vadodara. IPCL Vadodara January 2005
17 RLA of VU-40 type boiler of 180 MT/hour capacity at 96 kg/cm² (BHEL make) as per Table-1 of IBR regulation 391 A (B) at GNFC, Disst. Bharuch. GNFC Bharuch. April 2005
18 RLA of Boiler unit # 1 (100 MW) and unit # 5 (210 MW) at BTPS. Unit # 5, NTPC Badarpur September 2005
19 Providing testing & reporting services for 210 MW boiler of Unit No. 4 at Gandhinagar Thermal Power Station for Gujarat Electricity Board (GEB) Ghandhinagar TPS. October 2005
20 Remnant Life Assessment study of Boiler of unit no.3 (210 MW) at KTPS. Kolaghat TPS, WBPDCL November 2005
21 RLA of Boiler unit # 1 (100 MW) and unit # 5 (210 MW) at BTPS. Unit # 1, NTPC Badarpur November 2005
22 Providing testing & reporting services for HRSG – I (Reg. No. GT-2617 & 2618) in Co-Generation Plant. GT-2618, ONGC Hazira February 2006
23 RLA study of 110 MW Boilers at TTPS. NTPC Talcher. March 2006
24 Remnant Life Assessment (RLA) study of Boilers of 110 MW & 210 MW installed at Kota Super Thermal Power Station, Kota. Unit # 2, KSTPS Kota May 2006
25 Providing testing & reporting services for HRSG – I (Reg. No. GT-2617 & 2618) in Co-Generation Plant. GT-2617, ONGC Hazira June 2006
26 Remnant Life Assessment (RLA) study of Boilers of 110 MW & 210 MW installed at Kota Super Thermal Power Station, Kota. Unit # 3, KSTPS Kota June 2006
27 Remnant Life Assessment (RLA) study of Boilers of 110 MW & 210 MW installed at Kota Super Thermal Power Station, Kota. Unit # 1, KSTPS Kota July 2006
28 Remnant Life Assessment study of Boiler of unit no.1 (210 MW) at KTPS. Kolaghat TPS, WBPDCL June 2006
29 Remnant Life Assessment study of Boiler of unit no.1 (210 MW) at KTPS. Kolaghat TPS, WBPDCL June 2006
30 RLA study at NFL Panipat, Bathinda & Nangal. 150 TPH (VU-40)  Boiler Pressure Parts NFL,Bathinda March  2007
31 RLA study at NFL Panipat, Bathinda & Nangal. 182 TPH (VU-40)  Boiler Pressure Parts NFL,Nangal March  2007
32 RLA study at NFL Panipat, Bathinda & Nangal. 150 TPH (VU-40)  Boiler Pressure Parts NFL, Panipat April 2007
33 Remnant Life Assessment (RLA) of 14 TPH Taxmaco Boiler MBPL , Champa August 2007
34 RLA study at NFL Panipat, Bathinda & Nangal. 150 TPH VU-40)  Boiler Pressure Parts NFL,Bathinda December 2007
35 67.5 MW Boiler for Bharat Aluminium Company Ltd CPP Vedanta January 2008
36 RLA study at NFL Panipat, Bathinda & Nangal. 150 TPH VU-40)  Boiler Pressure Parts NFL,Bathinda March  2008
37 RLA study at NFL Panipat, Bathinda & Nangal. 182 TPH (VU-40)  Boiler Pressure Parts NFL,Nangal March  2008
38 RLA study at NFL Panipat, Bathinda & Nangal. 182 TPH (VU-40)  Boiler Pressure Parts NFL,Nangal March  2008
39 RLA study at NFL Panipat, Bathinda & Nangal. 150 TPH VU-40)  Boiler Pressure Parts NFL,Panipat March  2008
40 RLA study at NFL Panipat, Bathinda & Nangal. 150 TPH VU-40)  Boiler Pressure Parts NFL, Panipat April   2008
41 Remaining Life Assessment (RLA) study of VU-60 (84 TPH) Boiler # 3, M/N-518, CPP, BRPL. BRPL May 2008
42 Remanent Life Assessment (RLA) Study of two boilers (2x12.5) at RSGSM Ltd., Sriganganagar. Unit # 1, RSGSM November 2008
43 Remanent Life Assessment (RLA) Study of two boilers (2x12.5) at RSGSM Ltd., Sriganganagar. Unit # 2, RSGSM November 2008
44 RLA of Boiler for 2 units of Stage 1 (210 MW). Unit # 4, NTPC, Kahalgaon July 2009
45 RLA of Boiler for 2 units of Stage 1 (210 MW). Unit # 3, NTPC, Kahalgaon May 2009
46 Residual Life Assessment/ Life Extension study of Boilers and ESPs Performance test in 210 MW units 3 & 4. Unit #4, APGENCO August 2009
47 Remnant Life Assessment (RLA) study of drum & headers of evaporative cooling system (ECS) of reheating furnace No. 1, 2 & 3. Furnace # 3, SAIL Bhilai September 2009
48 Residual Life Assessment study of Unit 5 (110 MW) Boiler during 2009-10. TNEB Ennore October 2009
49 RLA study of 75 MT/HR capacity of Russian Boilers (B-3 & B-4) at Barauni Refinery. Unit # 3, Barauni refinery, IOCL October 2009
50 Remnant Life Assessment (RLA) study of drum & headers of evaporative cooling system (ECS) of reheating furnace No. 1, 2 & 3. Furnace # 2, SAIL Bhilai October 2009
51 Remaining Life Assessment Study of Unit # 2, 3, 4, 5 & 6 Boilers (5x120 MW). Unit # 6, NALCO December 2009
52 Remnant Life Assessment (RLA) study of drum & headers of evaporative cooling system (ECS) of reheating furnace No. 1, 2 & Furnace # 1, SAIL Bhilai November 2009
53 RLA study of Boiler Pressure Parts of (WHRB # I)150 MW NTPC Dadri November 2009
54 RLA Study of Boilers (2x57.5 MW), NSPCL Rourkela. Unit # 2, NSPCL Rourkela January 2010
55 Remaining Life Assessment Study of Unit # 2, 3, 4, 5 & 6 Boilers (5x120 MW). Unit # 5, NALCO January 2010
56 Remaining Life Assessment Study of Unit # 2, 3, 4, 5 & 6 Boilers (5x120 MW). Unit # 2, NALCO march  2010
57 RLA study of 210 MW Boiler of National capital power station Unit#1 NTPC Dadri April 2010
58 RLA study of 75 MT/HR capacity of Russian Boilers (B-3 & B-4) at Barauni Refinery. Unit # 4, Barauni refinery, IOCL May 2010
59 67.5 MW Boiler Pressure Parts BALCO May 2010
60 Rla study of Boiler No. 1 (275 MT/hr.) & main steam line header. KRIBHCO May 2010
61 Mini RLA of Boiler # 2 (285 TPH). Vedanta June 2010
62 Condition Assessment & Residual Life Assessment study of WHRB (Boiler) unit No. 3 GSECL August 2010
63 RLA Study of Boilers, turbine ,Generator & civil structure 100MW Unit#7,NLC,Neyveli SEPT  2010
64 RLA Study of Boilers Kochi Refinery October 2010
65 RLA Study of Boilers, turbine(210MW) Satpura thermal power station October 2010
66 Remaining Life Assessment Study of Unit # 2, 3, 4, 5 & 6 Boilers (5x120 MW). Unit # 3, NALCO June  2010
67 Remaining Life Assessment Study of Unit # 2, 3, 4, 5 & 6 Boilers (5x120 MW). Unit # 4, NALCO Sept 2010
68 RLA study of 210 MW Boiler of National capital power station Unit#2 NTPC Dadri Sept 2010
69 RLA study of boiler unit#1 & 3 HRSG UNIT#1 EPOL August 2010
70 RLA study of boiler unit#1 & 3 HRSG UNIT#3 EPOL July 2010
71 RLA study of boiler unit#1 WHRB UNIT#1 JBL,DURG September 2010
72 RLA study of boiler unit#2 WHRB UNIT#2 JBL,DURG November 2010
73 RLA study of boiler unit#1 NSPCL Unit#1 December 2010
74 RLA study of boiler unit#3 HBC UNIT#3 JBL,DURG December 2010
75 RLA study of boiler Unit#1 NLC TPS-2 December 2010
76 RLA study of Turbine 10.5MW Haldia refinary December 2010
77 RLA study of boiler unit#2 Vadodara Refinary December 2010
 
List of the Units where ENERGY AUDIT has been completed
Sl.No. Name of Assignment No. Of Units CLIENT NAME Completed Duration PERIOD
1 Energy Audit Of Boiler/Turbine 2X 18 MW Captive Power Plant 2 M/s Shree Cement Beawar, Rajasthan Two Months Sep 2005
2 Steam & Power Consumption in omaxe Auto unit  Industry 1 M/s Speedomax Industries (Sidhrawali Gujrat) One Month April 2005 to May 2005
3 5 nos. (260 MW to 623 MW) steam power plants and 10 nos.(35MW to 65MW) Gas Turbines. 5+10 Saudi Electricity Corporation of Saudi Arabia alongwith  M/s NTPC (India) Eight Months Feb 2007 to Oct 2007
4 Condition Assessment of OBRA 200 MW unit IX 1 Power Machines (India) One Month Nov 2007
5 210MW Boiler & Turbine  and Auxiliaries  1 Unit 3 of Kolaghat TPS of WBPDCL Two Months Dec 2007 to Jan 2007
6 210MW Boiler & Turbine  and Auxiliaries 1 Unit 5 of Kolaghat TPS of WBPDCL Two Months Jan 2008 to Feb 2008
 
List of the Units where PG TEST were conducted / consultancy provided
Sl.No. Unit Customer
1 P.G test conducted on P.S.E.B Bathinda unit – 1 (110 MW) NASL / PSEB
2 P.G.test consultancy provided as owner’s engineer for 2x15 MW Boiler TG unit of Ropar Cement Captive Power Plant Gujarat Ambuja Cements
3 P.G test consultancy provided as owner’s engineer for 1x15 MW Boiler TG unit of Bhatapara Cement Captive Power Plant Gujarat Ambuja Cements
4 P.G test consultancy provided as owner’s engineer for 1x15 MW Boiler TG unit of Shree Cement 1 x 18 MW Ras Captive Power Plant Shree Cements
5

Performance Evaluation test carried out on 5 Machines of Saudi Electric Company of sizes ranging from 260 MW to 623 MW

NTPC
6 Condition assessment test carried out on obra 210 MW steam turbine for evaluating the present performance level of the machine before undertaking renovation and modernization. Power Machines (India)
7 P.G test conducted on P.S.E.B Bathinda unit – 1 (110 MW steam turbine. It included demonstration of turbine heat rate, power out and unit auxiliary power consumption. NTPC Alstom / PSEB
8 P.G test consultancy provided as owner’s engineer for Lanco Amarkantak 300 MW Boiler TG Lanco Infratech Ltd
9 P.G test consultancy provided as owner’s engineer for Sagardighi 300 MW Boiler TG unit. West Bengal Power Development Corporation Ltd.
10 P.G test consultancy provided as owner’s engineer for HZL Boiler TG unit (80 MW) of Zawar Mines Hinduatan Zinc Ltd.
11 Thermal Performance Tests of 200 MW Boiler and auxiliaries at NTPC Ramagundam plant ANSALDO – Caldie India Ltd.